OPERATION INSTRUCTIONS
To get the best results with your new PULL-TITE® tool, please
follow these few basic instructions:
1. Adjust the vise-grip® pliers and clamp down securely on the
roofing membrane.
2. Slide the PULL-TITE® tool away from the membrane to remove the
slack in the cable, keeping the tool in-line with vise-grip® to
prevent damage.
3. When using the PULL-TITE® on a slick surface, tighten the two
stainless steel screws on the bottom plate. The
screws should not be used when the tool is resting on the roofing
membrane.
4. Apply pressure with knee, hand, or foot on the push pedal to
reach the desired tension on the roofing membrane.
5. Install roofing fasteners or hot air seaming, release the
vise-grip®, move on, and repeat from step No. 1.
|